                Holden DPW has begun Rail Trail surface construction between the two Kaplan Bridges, October 2002.

The trail bed has been scraped, ditches dug and the tree stumps were removed. The next step will be to lay down the surface gravel.

This part of the trail (near the Charlotte Kaplan bridge) was in critical need of repair due to the surface water in this area.

                


    

Wachusett Greenways sponsored a bike trip to the Nashua  River Rail Trail in Ayer, MA on October 29, 2002.