{"id":13286,"date":"2026-09-04T20:00:07","date_gmt":"2026-09-05T00:00:07","guid":{"rendered":"https:\/\/www.wachusettgreenways.org\/wordpress\/?p=13286"},"modified":"2026-10-14T16:08:23","modified_gmt":"2026-10-14T20:08:23","slug":"mass-central-rail-trail-dedication-september-29th-1pm","status":"publish","type":"post","link":"https:\/\/www.wachusettgreenways.org\/wordpress\/mass-central-rail-trail-dedication-september-29th-1pm\/","title":{"rendered":"Mass Trails 10 \/ Mass Central Rail Trail Ride or Walk &#8211; Friday Oct 23rd, 2026 @ 1PM"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.17.6&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; link_option_url_new_window=&#8221;on&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p style=\"font-weight: 400;\">The Mass Central Rail Trail \u2013 Wachusett Greenways section through Rutland, Oakham and Barre is highlighted in the 2026 <a href=\"https:\/\/www.masstrails10.org\/\" target=\"_blank\" rel=\"noopener\">Mass Trails 10<\/a> featuring wonderful trails.\u00a0 You are invited to join Wachusett Greenways for a bike ride or walk on this section of the MCRT Friday, October 23rd, 1 p.m.<\/p>\n<p style=\"font-weight: 400;\">We will meet at 1 p.m. at the MCRT parking lot in Rutland at Route 122, one mile northwest of the intersection with Route 122A. The location is <a href=\"https:\/\/maps.app.goo.gl\/pLtsDAojzvwwtmao9\">Barre Paxton Road (Rte. 122), Rutland<\/a> (42.36737752287484, -72.00197922657726).\u00a0You\u2019ll see white reflector strips standing along the road at the parking and an accessible portable restroom.<\/p>\n<p style=\"font-weight: 400;\">Riders will go west 4.5 miles, then ride back to the beginning.\u00a0 Then riders will ride 4+ miles east and reverse to the starting point.\u00a0Total ride distance is 17 miles.\u00a0 Riders can stop midway at the entry point if you wish.<\/p>\n<p style=\"font-weight: 400;\">Walkers will walk west and east up to 3 miles total.<\/p>\n<p style=\"font-weight: 400;\">We\u2019ll share refreshments and encouragement to continue building and maintaining the MCRT Wachusett Greenways 30 mile section.<\/p>\n<p style=\"font-weight: 400;\">The Mass Central Rail Trail is growing along the 104+ mile corridor between Northampton and Boston.\u00a0 Come enjoy this treasured trail with us!<\/p>\n<p style=\"font-weight: 400;\">Participation for each day is limited to 25.<\/p>\n<p>Register <a href=\"https:\/\/www.wachusettgreenways.org\/wordpress\/about-us\/mass-trails-10\/\">here<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Mass Central Rail Trail \u2013 Wachusett Greenways section through Rutland, Oakham and Barre is highlighted in the 2026 Mass Trails 10 featuring wonderful trails.\u00a0 You are invited to join Wachusett Greenways for a bike ride or walk on this section of the MCRT Friday, October 23rd, 1 p.m. We will meet at 1 p.m. [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":7021,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<p style=\"text-align: left;\">Thank you to all the participants for our October 4th run, walk & rides! It was great to see everyone out on a beautiful day enjoying the MCRT!<\/p>\r\n<p style=\"text-align: left;\">For any questions - <a href=\"mailto:contact@wachusettgreenways.org\">contact us<\/a>, <a href=\"mailto:colleen.abrams@verizon.net\">colleen.abrams@verizon.net<\/a> or by phone 508-479-2123.<\/p>","_et_gb_content_width":"","footnotes":""},"categories":[4,15,78],"tags":[],"class_list":["post-13286","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-events","category-greenways-in-the-news","category-trail-updates"],"_links":{"self":[{"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/posts\/13286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/comments?post=13286"}],"version-history":[{"count":9,"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/posts\/13286\/revisions"}],"predecessor-version":[{"id":14142,"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/posts\/13286\/revisions\/14142"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/media\/7021"}],"wp:attachment":[{"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/media?parent=13286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/categories?post=13286"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wachusettgreenways.org\/wordpress\/wp-json\/wp\/v2\/tags?post=13286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}